An electrical contractor who had outgrown a rented bay. Fourteen-foot doors, a small office at the front, and enough service to run a bender and two compressors at once.
Warren, Washington & Saratoga counties
Nine people, one shop on Dix Avenue, and a 45-mile radius. Ray Ostrander started Iron Ridge in 2008 after fourteen years framing for somebody else, and the crew has built outbuildings and light commercial ever since.
A detached two-car garage runs $48,000 to $72,000 and takes five to seven weeks. The full range is below, because you should not have to ring up to find out whether you can afford us.
What we build
We pour our own slabs instead of subbing the concrete out. At nine people that is unusual, and it is the reason our garage timelines are shorter than most quotes you will get.
We framed houses for years and we are not going back. If you are building a home, ask us and we will give you two names of people who do it properly.
Remodel work inside an occupied house is a different trade with different scheduling, and we are bad at it.
We roof what we build. We do not take roofing-only jobs, because a roofer will do it faster and for less.
If our crew would not be on site doing the work, we are just adding a margin to someone else's quote. That is a referral, not a job.
What things cost
These are what jobs actually closed at over the last two years, not a starting figure that doubles once you talk to us. Site conditions move the number, and a bad slope or a long utility run moves it a lot.
| Build | Cost and duration |
|---|---|
| Detached two-car garageSlab, framing, siding, roof, one service door and two overhead doors. The most common thing we build. | $48,000–$72,0005 to 7 weeks |
| Garage with workshop aboveSame footprint with a usable second floor, stairs and insulation. Heating it is a separate conversation and a separate trade. | $86,000–$130,0008 to 11 weeks |
| Three-bay trade shopLight commercial. Fourteen-foot doors, a small office, and the electrical capacity to run equipment. Permits and inspections included. | $180,000–$320,00014 to 20 weeks |
| Equipment barn, post-framePost-frame rather than stick-built, which is why it is quick and why it costs what it does. Good for tractors, trailers and hay. | $65,000–$110,0004 to 6 weeks |
| Covered storage or lean-toRoof, posts, gravel or slab. The cheapest way to get equipment out of the weather. | from $28,0002 to 3 weeks |
| Full drawingsCredited against the job if you go ahead with us. The site visit and the ballpark number before this are free. | $450about 2 weeks |
Licensed and insured
If one of them hesitates, that is your answer. Ours are printed here so you do not have to ask.
Warren County Home Improvement Contractor licence. Current, and checkable with the county.
General liability cover. Certificate goes out with every contract, not on request.
Workers' compensation on every employee. Nobody on our site is carried as a subcontractor to dodge it.
We pull the permits and we sit through the inspections. That is included in the number you are quoted, and it is not a line we add at the end.
How a job runs
Ray walks the ground with you and gives a ballpark number the same day. Plenty of these end with us saying the budget will not reach it.
Proper drawings you could take to another builder. Credited back if you build with us.
We file with the town and get you a start date. This is the part nobody enjoys and it is why the wait is what it is.
Our own crew and our own slab, start to finish. You get a weekly call on Fridays whether or not anything interesting happened.
Service area
Past that the drive eats the margin and the job suffers for it, so we say no rather than quote high and hope. If you are outside the line, call anyway and we will point you at someone closer.
Recent work
An electrical contractor who had outgrown a rented bay. Fourteen-foot doors, a small office at the front, and enough service to run a bender and two compressors at once.
Two bays below, a woodshop above, and a staircase wide enough to carry sheet goods up without taking the handrail off. The owner had been planning it for nine years.
Illustrative projects and imagery for this concept website.
Starting a project
Those two things are enough for a useful first phone call. You do not need drawings, dimensions or a decision. Most of the people who call us have been thinking about the building for years.
Iron Ridge is a fictional company. This concept site was built by Gateway Web Strategy + Design to show what a contractor's website can do when it answers the questions people actually have.
Visit Gateway